Custom exhibition stand for Agility Grid at Intersec, Dubai World Trade Centre: white canopy, green ceiling panels and a lit floor edge

Exhibition standsCustom, modular and double-deck

Stands designed around your brand and your floor plan, for shows across the UAE and in Saudi Arabia.

We design your stand in 3D around the brief and the floor plan, then manage its fabrication, delivery and installation so that the stand you approve on screen is the stand that opens on the show floor. Custom builds, reusable modular systems and double-deck structures are all designed and managed the same way.

Who it suits

Any exhibitor, from a 9 m² shell-scheme upgrade to a two-storey island stand.

How it works

Etihad Airways stand with a dark canopy, a lounge and bar tables, built for the airline and its partners

From brief to 3D concept

We start with your objectives for the show: who you want to meet, what you need to demonstrate and how many people have to work the stand at once. Our designers turn that into a 3D concept with plans, elevations and material samples, and revise it with you until it is right.

The concept is drawn to be built: structure, cabling, storage and venue rules are worked out before you approve it, so there are no surprises between the render and the hall.

B·G 1930 jewellery pavilion in Saudi Arabia, a velvet tent with a chandelier among glass showcases

Built to the drawings, installed at the venue

Fabrication follows our drawings and is checked before delivery. We handle the venue drawings and approvals for Dubai World Trade Centre, Expo City Dubai, ADNEC and other halls, and the stand is installed ahead of the organiser deadline. For two-storey stands that includes structural calculations and sign-off.

We are on site through the show for any changes, and the stand is dismantled after close. Modular kits and custom elements can be kept for your next show.

  • Sonic Jet Aviation stand at the Dubai Airshow, with angled white panels, blue graphics and edge lighting

Included as standard

  • One point of responsibility

    Design, build, graphics, lighting, installation and dismantling under one contract.

  • Built to your brand

    Colours, materials and signage follow your guidelines, not a template.

  • Designed for working

    Meeting space, storage, demo areas and visitor flow planned from the first sketch.

  • Reusable where it helps

    Modular systems and custom elements can be kept and re-skinned for later shows.

Request a quote

Reply within one working day.

Questions about exhibition stands

How long does a stand take?

Allow four to six weeks from approved concept to installation for most stands. Two-storey builds need longer for structural approvals; modular stands can be quicker.

Custom or modular: which should we choose?

Custom when the stand has to be unmistakably yours or the space is unusual. Modular when you exhibit several times a year and want a kit that goes up fast with new graphics each time. We will tell you which fits the brief and the budget.

Can you work from our agency’s design?

Yes. We check the design for structure and venue compliance, then manage the build and installation from it.